Critical Examination Of C-130 Programmed Depot Maintenance (pdm) Induction Methodology: Determining Pdm Intervals

by Air University (u.s.). Air Command And S

2021-05-26 13:40:37

The current USAF process for establishing intervals between C-130 PDM does not account for the wide range of aircraft variables within each aircraft MDS. This paper develops an analytical model, based on five unique aircraft variables, to provide C-1... Read more
The current USAF process for establishing intervals between C-130 PDM does not account for the wide range of aircraft variables within each aircraft MDS. This paper develops an analytical model, based on five unique aircraft variables, to provide C-130 maintainers with a prediction tool to forecast when a C-130 aircraft requires PDM. These five variables include: aircraft age, total flying hours, average yearly flying hours, mission profile (expressed as a severity factor), and operating location of the aircraft. Interviews with C-130 SPO personnel, combined with use of the C-130 Service Life Data Base, provided the required data to develop the C-130 PDM interval model.The C-130 PDM interval model developed in this paper allows maintainers and operators to predict the optimum time between C-130 PDM activities. It eliminates the requirement to base PDM intervals on aircraft MDS. As a result, there is a potential for significant savings by deferring PDM for a portion of the C-130 fleet. Finally, the PDM interval model developed in this paper may be applicable for other DOD aircraft which use aircraft MDS as the determinant of PDM intervals. Less

Book Details

ISBN9781249414612

Compare Prices

Store Availability Book Format Condition Price
Indigo Books & Music In Stock Buy CAD 59.00
Indigo Books & MusicIn Stock
Format
Condition
Buy CAD 59.00
Available Discount
No Discount available

Join us and get access to all
your favourite books

Sign up for free and start exploring thousands of eBooks today.

Sign up for free